How to begin repair works of the apartment?

The very first stage of the repair of aged apartments is typically the destruction and taking out first of just about all from the dilapidated wall space and partition walls, removing the wall structure and ceiling covering. This stage is usually one of typically the most “dirty” stages in the repair.

A single more among the most crucial and “dusty” performs is the windowpane block replacement. It is necessary to do this 1st of all because dirt and dirt will be unallowable throughout following stages plus it is prohibited at all to open windows throughout painting and wallpapers works (large droplets of the temperature and moisture are unallowable). After mounting windows and windowsills it is required to pack all of them immediately in polyethylene film and to cover windowsills within addition by the fiberboard (in so that it will stop scratches).

The next phase is wiring. Wiring can be mounted in walls or even along the ground. Wiring is made inside the water lines to ensure power safety and boost reliability. The water pipe protects wiring from external damages and allows to replace the wire completely without breaking walls and floor simply by inserting the newest wire instead of the old one.

House Painting employs the wiring. The frequent mistake throughout the simultaneous conducting of such works occurs when staff forget to place out one of the cables and house artists have already drunk and smoothed out the wall. As a result, additional performs are necessary to be able to seal chases on the finished wall. The places of the feed switch in addition to wall outlet place and their number must be thought-out within advance. The structure of power electrical wiring is usually integrated into the design task.

Afterwards the program must be prepared to service in circumstance of failures. Inside addition to the particular wirings, the telephone wire and the TELEVISION cable are laid out. The power cable connection really should not be laid away near the phone and antenna cables to avoid sound pickup and disturbance. The most peculiar second is laying out there the TV cable connection. In order in order to make two (or three) TV makes its presence felt the apartment the other cable is often simply “firmly soldered” in parallel, so the cable level of resistance is lowered. Since a result, the particular image quality is damaged, many programs can’t be received plus etc. In order to avoid this kind of situation it is necessary to ask a specialist with special equipment. He or she will gauge the transmission level of typically the each TV-feeder in addition to install TV-amplifiers or TV-filters.

Painting is considered the most long-term process, for this reason it is carried out simultaneously in all premises, when it is feasible. Delays are linked with the technology. Each applied level of the plaster (or filling in finishing) must dry out completely ahead of the function will continue.

Works in sanitary plans and the kitchen begin simultaneously together with house painting. It is best to fulfill apparent “dirty” works in the first spot and simultaneously. In accordance with the plan of the sanitary technician location welded, wall chasing plus pipe run are usually conducted. Steam radiator admissions are ready, taps and brackets are mounted, nevertheless radiators are certainly not installed.

Then works inside sanitary arrangements usually are conducted based on the plan. The bath is usually mounted, then wall space are smoothed out and the ceramic tile is laid upon walls. The next stage is putting together ceiling and laying tiles on typically the floor. And from last other hygienic devices, mixers plus accessories are installed.

After wiring, installation of rosette dishes and terminal bins the voltage will be checked in every level. Ends of wiring are insulated and laid out in to rosette plates. Electrical sockets and breakers are certainly not installed during this specific stage in buy to save their surface appearance. The particular finish puttying associated with walls is performed simultaneously. The technically exact control over blow drying of the coating of the plast typer (filling) is carried out by drymeter. It is a special instrument that will measures moisture associated with the material.

The following stage is the particular means of fill. Load can be made along with different materials – from usual brickwork cement-sand mixture to be able to self-aligning floors. The particular advantage of the simple mixture is usually its cheapness, the disadvantage is that such mixture will be much harder lined up at the level and the final dry time associated with such fill will be 40 days, simply then the next stage of typically the work with floor can be conducted, i. e. the period is usually too long. Self-leveling self-aligning floors are much more expensive, nevertheless more technological. Aiming occurs almost “automatically” i. e. fluid solution of blend is poured out there, then it operates and you obtain the horizontal surface. The final dry time is two weeks i. e. you could have significant time economic climate. The system “warm floor” is set up in to the fill. When the so-called “wet processes” are inapplicable the technology regarding the dry aiming (the fill technology) is used bases for floors together with adjustable floor battens are mounted.

Following fill door containers and door usually are installed. Installation of doorways must take in to the account thickness of future floor covering. After installation the doorway can be obtained off its hinges and removed till the end regarding repair or packed into polyethylene movie to protect through damages. Simultaneously threshold can be painted and the tile can be laid in this premises where it was planned. The floor tile must be put on the absolutely dried out overlay.

Finishing of the floor increasing depends on typically the planned covering. Within most cases (if finish covering is just not the tile) load is covered by simply bitumen mastic plus plywood sheets usually are laid. They are fixed to the floor by self-tapping anchoring screws. One plywood sheet is fixed by 30-50 self-tapping screws to provide the particular close fixing of plywood and extensive service from the flooring without squeak in addition to bulging. The plywood gives the extra heat- and acoustic insulation. After mounting of the hdf is completed, wallpaper for painting can be pasted on wall space.

In premises wherever finish covering regarding the floor will be laminated flooring or parquet hoard, the normal wallpapers are pasted (not for painting) in the first place. Then typically the flooring is mounted.

If finish addressing in the floor will be the block parquet, the parquet will be laid to begin with, after that it is scraped and covered by simply one layer associated with lacquer. After this particular the ordinary wall-papers are pasted and the parquet is included in the rest tiers of lacquer (depending within the quality of the parquet plus lacquer). The described consequence is linked only with this kind of scrambling process when the great quantity of dust will be created. Regardless of typically the fact that very good floor grinders usually are equipped with the vacuum cleaner, typically the sufficient amount associated with dust is precipitated on surrounding topics including walls. Dust particles is very acerbic and is badly washed off. Of which is why to be able not to destruction wallpapers, they are pasted after scrambling and in purchase the parquet usually do not absorb the excessive moisture it is covered by the one layer of ename before wallpaper pasting.

After http://aggressiveplumbing.com can be considered to be able to be finished. This is left just to install the plinths, decorative elements, breakers and sockets, drape holders, to hang up doors, plant-bands in addition to others.

To conclude that is necessary in order to note that typically the sequence of works was listed in general and can change based on the particular situation – typically the number of areas in premise, your current resources, peculiarities of the construction regarding the multilevel building. It is centered on sound judgment and every person able to analysis can separately create such a sequence.